The work area for a totally unrelated pipeline project has moved into the construction zone of a nearby running bridge reconstruction. What used to be a busy six lane road is now down to one lane in each direction. So now traffic backs up a long way since there aren’t many routes across the river. I really wonder who though that two simultaneous projects in the same area was a good idea.